Abstract

Coiled tubing (CT) has become a critical technology in oil and gas operations, yet its service life is constrained by fatigue, corrosion, and erosion. In marginal fields, the high capital cost of new CT strings for permanent installations such as gas lift creates significant economic challenges. Reusing existing CT assets presents a cost-efficient and sustainable alternative. This study conducts a systematic literature review of 33 Scopus-indexed journal and conference publications to examine CT failure mechanisms, integrity inspection methods, and the economic potential of reuse in marginal fields. The reviewed data were classified by failure mode, inspection technique, application, and economic perspective. The findings reveal that low-cycle fatigue is the most extensively studied failure mode, with wall thickness reduction identified as a key indicator of structural degradation. Current integrity assessments rely heavily on predictive modelling and non-destructive evaluation (NDE) methods, particularly magnetic flux leakage (MFL) and eddy current testing (ECT). Nevertheless, the absence of reliable, field-practical wall thickness measurement remains a critical gap, for which ultrasonic testing (UT) emerges as a promising solution. Case studies further demonstrate the technical feasibility and cost-effectiveness of CT reuse. This review underscores the importance of transitioning from a linear “use-and-scrap” paradigm toward a circular “use-inspect-reuse” framework, with UT serving as a pivotal enabler. This approach enhances economic viability and advances alignment with the United Nations Sustainable Development Goals.

References

Brown, P., Gunby, B., & Torres, C. (2019, March). An Analysis of Coiled Tubing Performance. In SPE/ICoTA Well Intervention Conference and Exhibition (p. D011S003R005). SPE. https://doi.org/10.2118/194306-ms

Brown, P., Gunby, B., & Torres, C. (2019b). An Analysis of Coiled Tubing Performance. SPE/ICoTA Well Intervention Conference and Exhibition, D011S003R005. https://doi.org/10.2118/194306-MS

Chmelko, V., & Margetin, M. (2020). The performance of selected multiaxial criteria under tension/torsion loading conditions. International Journal of Fatigue, 135, 105532. https://doi.org/10.1016/j.ijfatigue.2020.105532

Ronaldo, H. T., Wijoyo, N. D., & Prasandi, A. A. (2019). Progressing Cavity Pump As A Solution To Increase Productivity Of Highly Viscous Oil Wells With Sand Production: A Case Study Of Field X. Scientific Contributions Oil and Gas, 42(3), 115-118. https://doi.org/10.29017/SCOG.42.3.376

Jia, P., Zhu, X., Xue, S., & Fang, J. (2020). Numerical simulation on coiled tubing erosion during hydraulic fracturing. Journal of Failure Analysis and Prevention, 20(6), 1928-1938. https://doi.org/10.1007/s11668-020-01006-5

Khalid, A., Molero, N., Hassan, G., Lovie, E., & Khan, R. S. A. (2020, January). Coiled tubing gas lift: an innovative solution for reviving dead wells in southern Pakistan. In International Petroleum Technology Conference (p. D013S110R002). IPTC. https://doi.org/10.2118/19930-MS

Li, N., Zhu, L. X., Cong, S., & Feng, Y. R. (2020, June). Fracture Failure Analysis of Φ50. 8mm Coiled Tubing. In Materials Science Forum (Vol. 993, pp. 1235-1241). Trans Tech Publications Ltd. https://doi.org/10.4028/www.scientific.net/MSF.993.1235

Long, Y., Huang, S., Peng, L., Wang, S., & Zhao, W. (2021). A novel compensation method of probe gesture for magnetic flux leakage testing. IEEE Sensors Journal, 21(9), 10854-10863. 10854–10863. https://doi.org/10.1109/JSEN.2021.3059899

Mao, L., Cai, M., Liu, Q., & Wang, G. (2020). Influence of oil-water ratio on the wear of Cr13 casing lubricated with drilling fluid. Materials Today Communications, 25, 101341. https://doi.org/10.1016/j.mtcomm.2020.101341

Maurenza, F., Yasutra, A., & Tungkup, I. L. (2023). Production forecasting using arps decline curve model with the effect of artificial lift installation. Scientific Contributions Oil and Gas, 46(1), 9-18. https://doi.org/10.29017/SCOG.46.1.1310

Moffat, A. G. (2020, March). Concentric Gas Lift System Development and Installation in the UK North Sea. In SPE/ICoTA Well Intervention Conference and Exhibition (p. D011S001R003). SPE. https://doi.org/10.2118/199827-MS

Mohammadi, M., Abadeh, A., Nemati-Farouji, R., & Passandideh-Fard, M. (2019). An optimization of heat transfer of nanofluid flow in a helically coiled pipe using Taguchi method. Journal of Thermal Analysis and Calorimetry, 138(2), 1779-1792. https://doi.org/10.1007/s10973-019-08167-y

Mustaffa, Z., Halim, A. H. A., Kim, D. K., & Van Gelder, P. H. A. J. M. (2021). Reliability assessment of the vertical well system subjected to erosion and tubing failure. Ships and Offshore Structures, 16(2), 127-134. https://doi.org/10.1080/17445302.2019.1710929

Pudiyarto, S., Widiyanto, G., & Suryono, S. (2015). Pengembangan Teknologi Ultrasonografi Untuk Aplikasi Bidang Migas (Rekayasa Alat Inspeksi Sumur). Lembaran publikasi minyak dan gas bumi, 49(3), 235-242. https://doi.org/10.29017/LPMGB.49.3.1199

Shaohu, L., Feng, G., Xianjin, W., Hui, X., Zhen, W., & Ting, Y. (2019). Theoretical and experimental research of bearing capacity and fatigue life for coiled tubing under internal pressure. Engineering Failure Analysis, 104, 1133-1142. https://doi.org/10.1016/j.engfailanal.2019.06.062

Shaohu, L., Hao, Z., Hong, Z., Yang, L., & Zhen, W. (2021). Experimental and numerical simulation study on fatigue life of coiled tubing with typical defects. Journal of Petroleum Science and Engineering, 198, 108212. https://doi.org/10.1016/j.petrol.2020.108212

Shaohu, L., Hao, Z., Hui, X., & Quanquan, G. (2021). A new theoretical model of low cycle fatigue life for coiled tubing under coupling load. Engineering Failure Analysis, 124, 105365. https://doi.org/10.1016/j.engfailanal.2021.105365

Shaohu, L., Yuandeng, W., & Hao, Z. (2021). Critical ultimate load and ultimate bearing failure of CT110 with initial crack defect. Journal of Failure Analysis and Prevention, 21(1), 204-212. https://doi.org/10.1007/s11668-020-01047-w

Shaohu, L., Yuanliang, L., & Hong, Z. (2020). Corrosion Failure and Electrochemical Corrosion Behavior of Coiled Tubing. Journal of Failure Analysis and Prevention, 20(6), 1964-1974. https://doi.org/10.1007/s11668-020-01007-4

Sherik, A., Ben Abdalla, M., Abdoalqader, A., Abusninah, G., Abdaldaem, A. A., & Ben Ayad, A. N. (2019, October). Coiled-Tubing Gas Lift System Doubled Oil Production from Al-Wafa Field. In SPE Kuwait Oil and Gas Show and Conference (p. D033S020R004). SPE. https://doi.org/10.2118/198096-MS

Subaii, A., Al Ghubayni, M. R., Shawli, Y., Sunagatov, R., Ahmed, D., Arifin, M., ... & Santali, M. (2020, March). Successful Retrieval of First Installed Velocity String–A Case Study from Middle East. In SPE/ICoTA Well Intervention Conference and Exhibition (p. D011S001R001). SPE. https://doi.org/10.2118/199837-MS

Tale, S., Ahmed, R., Elgaddafi, R., & Teodoriu, C. (2021). Sulfide stress cracking of C-110 steel in a sour environment. Corrosion and Materials Degradation, 2(3), 376-396. https://doi.org/10.3390/cmd2030020

Tong, S., & Gao, D. (2019). Elastic-plastic collapse limit analysis of coiled tubing under complex stress state. Journal of Petroleum Science and Engineering, 174, 106-114. https://doi.org/10.1016/j.petrol.2018.11.018

Varma, N., Nagar, A., Manish, K., Srivastav, P., Nekkanti, S., Bohra, A., & Srivastav, P. (2019, April). Prosper & cerberus modelling for efficient WBCOs in artificial lift flowing wells. In SPE Oil and Gas India Conference and Exhibition? (p. D021S011R003). SPE. https://doi.org/10.2118/194687-MS

Vera, V., Torres, C., & Higuera, J. (2020, March). Real-Time Hybrid Coiled Tubing Technology: A Review of Challenges and Opportunities in Field Operations. In SPE/ICoTA Well Intervention Conference and Exhibition (p. D022S019R001). SPE. https://doi.org/10.2118/199840-MS

Wiranata, K., Ridene, A., Yusoff, M. N. A. M., Hamdi, A., Sa, R., Chaari, Y., & Arifin, M. (2020, January). Novel Application of Magnetic Flux Leakage-Based Technology Validating Pipe Elongation in Coiled Tubing Drilling Operation. In International Petroleum Technology Conference (p. D032S207R002). IPTC. https://doi.org/10.2523/iptc-20084-ms

Yan, F., Li, Z., Zhang, C., & Wang, H. (2021). Study on grooving corrosion behavior of QT800 coiled tubing. AIP Advances, 11(4). https://doi.org/10.1063/5.0044098

Yang, Q., Xie, S., He, K., Chen, Y. E., Chen, Z., Uchimoto, T., & Takagi, T. (2021). A novel circumferential eccentric eddy current probe and its application for defect detection of small-diameter tubes. Sensors and Actuators A: Physical, 331, 113023. https://doi.org/10.1016/j.sna.2021.113023

Yang, Q., Xie, S., He, K., Chen, Y. E., Chen, Z., Uchimoto, T., & Takagi, T. (2021). A novel circumferential eccentric eddy current probe and its application for defect detection of small-diameter tubes. Sensors and Actuators A: Physical, 331, 113023. https://doi.org/10.1016/j.sna.2021.113023

Zhang, Y., Luo, Q., Wang, H., Gong, X., & Guo, L. L. (2021). Residual Life Study of Coiled Tubing for Erosion Wear. Journal of Failure Analysis and Prevention, 21(1), 320-328. https://doi.org/10.1007/s11668-020-01065-8

Zhao, G., Li, J., Zhang, Y. X., Zhong, J., Liang, Z., & Xiao, S. (2019). A study on ductile fracture of coiled tubing based on cohesive zone model. Engineering Fracture Mechanics, 209, 260-273. 209, 260–273. https://doi.org/10.1016/j.engfracmech.2019.01.027

Zhao, G., Zhong, J., Feng, C., & Liang, Z. (2020). Simulation of ultra-low cycle fatigue cracking of coiled tubing steel based on cohesive zone model. Engineering Fracture Mechanics, 235, 107201. https://doi.org/10.1016/j.engfracmech.2020.107201

Zhao, J., Li, W., Ge, J., Yuan, X. A., Yin, X., Zhu, Y., ... & Li, J. (2020). Coiled tubing wall thickness evaluation system using pulsed alternating current field measurement technique. IEEE Sensors Journal, 20(18), 10495-10501. https://doi.org/10.1109/JSEN.2020.2993028

Zhou, Z. M., Tan, J. S., Wan, F., & Peng, B. (2019). Improvement and determination of the influencing factors of coiled tubing fatigue life prediction. Advances in Mechanical Engineering, 11(9), 1687814019880131. https://doi.org/10.1177/1687814019880131

Zhou, Z., Qin, M., Xie, Y., Tan, J., & Bao, H. (2020). Experimental study of microstructures in bias weld of coiled tubing steel strip with multi-frequency eddy current testing. IEEE Access, 8, 48241-48251. https://doi.org/10.1109/ACCESS.2020.2979414

Zhou, Z., Zhang, J., Wang, C., Wan, F., He, S., & Yu, R. (2020). Non-magnetization detection of arbitrary direction defects in coiled tubing based on fluxgate sensor. IEEE Sensors Journal, 20(14), 7661-7668. https://doi.org/10.1109/JSEN.2020.2979497

Published

21-11-2025

Issue

Section

Articles