One Phase Well Design for Minimum Drilling Cost at Zaz Field
DOI:
https://doi.org/10.29017/scog.v48i3.1888Keywords:
Three Phase Well, One Phase Well, drilling cost, casing costAbstract
Drilling cost components including rig, casing and accessories, well surface equipment, drilling mud, bits, cementing, and casing installation substantially influence the overall drilling cost. The One Phase Well (OPW) design is implemented by eliminating the surface casing, which is conventionally applied in casing designs for wells in the ZAZ Field. This study evaluates drilling parameters such as well data, well trajectory, pore pressure–fracture gradient, drilling time, material usage, and drilling costs. A well profile analysis is conducted to compare the Three Phase Well (TPW) and One Phase Well (OPW) designs. Analysis of drilling time, materials, and drilling costs is carried out to evaluate the cost reduction difference between the Three Phase Well (TPW) method and the One Phase Well (OPW) method.The OPW design reduces rig rental costs by 34.9%, bit costs by 53.9%, casing costs by 20.5%, wellhead costs by 8.7%, and mud costs by 3.7%. In contrast, cementing costs increase by 0.7%, and casing installation incurs an additional cost of USD 24,017. Overall, the total drilling cost difference between OPW and TPW amounts to USD 68,633, with OPW achieving a 12.7% reduction in overall drilling costs compared to TPW.
References
Bahari, A., & Seyed, A. B. (2007, June). Drilling cost optimization in Iranian Khangiran gas field. In SPE International Oil Conference and Exhibition in Mexico (pp. SPE-108246). SPE. https://doi.org/10.2118/108246-MS
El Bakly, O., Ali, K., & El Dawey, M. (2007, October). Optimized Drilling Cost Per Foot in KPC Versus the Increase of Drilling Tangible and Intangible Cost (Case Study). In SPE/IADC Middle East Drilling Technology Conference and Exhibition (pp. SPE-108298). SPE. https://doi.org/10.2118/108298-MS
Emanuella W. Y. P., Panca Wahyudi, & Risnawati. (2010). Penelitian Desain Lumpur untuk Mengatasi Terjadinya Pengendapan oleh Material Lumpur maupun Formasi akibat Pengaruh Temperatur Tinggi dan Kontaminan Fluida Formasi. Lembaran Publikasi Minyak Dan Gas Bumi (Lpmgb), 44(2), 171-184. https://doi.org/10.29017/LPMGB.44.2.162
Halal, A. S., Warling, D. J., & Wagner, R. R. (1996, October). Minimum cost casing design. In SPE Annual Technical Conference and Exhibition? (pp. SPE-36448). SPE. https://doi.org/10.2118/36448-MS
Handoko, A. I., Bimastianto, P., Maulana, M. D., Agriawan, C., Brahmantio, R. A., Abidiy, I., & Setiawan, T. (2017, October). Shallow Light Architecture: A Viable and Cost-Effective Solution for Marginal Reserves in Tunu Shallow Development. In SPE Asia Pacific Oil and Gas Conference and Exhibition (p. D012S036R080). SPE. https://doi.org/10.2118/186936-MS
Hanif, I., Sayogyo, B., Riko, R., Hadistira, P., & Sari, K. (2021, October). One Phase Well OPW: Unlock Shallow Reservoir Efficient and Economically by Eliminating Surface Casing. In SPE Asia Pacific Oil and Gas Conference and Exhibition (p. D012S032R049). SPE. https://doi.org/10.2118/205612-MS
Julikah, J., Sriwidjaya, S., Hadimuljono, J. S., & Panuju, P. (2015). Hydrocarbon Shale Potential In Talang Akar And Lahat Formations On South And Central Palembang Sub Basin. Scientific Contributions Oil and Gas, 38(3), 213-223. https://doi.org/10.29017/SCOG.38.3.549
Julikah, J., Rahmat, G., Wicaksono, A. B., & Anwari, J. (2020). Shale Plays Characterization of the Talang Akar Formation in the Jambi Sub-Basin, South Sumatra Basin. Scientific Contributions Oil and Gas, 43(3), 99-114. https://doi.org/10.29017/SCOG.43.3.517
Oumer, S., Taufiqurrachman, H., Perruchot, M. P., & Yunus, F. (2010, November). Well design specificities for shallow gas production of Tunu field. In IADC/SPE Asia Pacific Drilling Technology Conference and Exhibition? (pp. SPE-134957). SPE. https://doi.org/10.2118/134957-MS
Oumer, S., Widiwibowo, F., Yunus, F., & Choux, J. C. (2011, November). Indonesia" Tunu 18 days" Project Case History: Innovations and New Technologies Bringing the Well Construction Performance to Unthinkable Levels. In International Petroleum Technology Conference (pp. IPTC-14808). IPTC. https://doi.org/10.2523/IPTC-14808-MS
Sayogyo, B., Hermawan, A., & Andoni, B. (2022, March). Delivering a One Phase Well Under Two Days with a One Inch Cutter PDC Drill Bit: A Record Breaking Performance in Mature Field, Drilling Optimization Case History. In Offshore Technology Conference Asia (p. D031S018R006). OTC. https://doi.org/10.4043/31638-MS
Wibowo, A. S., Ulpah, N., Ariel, G., Ismail, T., & Sobirin, M. (2022). Industrialization One Phase Well Perforation in Marginal Shallow Reservoir while Maintaining Proper Well Integrity Aspect: Successful Milestone in Tunu Field, Delta Mahakam, East Kalimantan. Journal IATMI. https://journal.iatmi.or.id/index.php/ojs/article/download/295/301/895
Wojtanowicz, A. K., State, L., Eric, U., & Maidla, E. (1987). Minimum-cost casing design for vertical and directional wells. Journal of Petroleum Technology, (SPE Paper No. 17107). https://doi.org/10.2118/14499-PA
Shahin, M., Mohamed, I., & Sofos, P. (2018, November). Casing Drilling Resulted in Slimmer Hole Design and Significant Cost Savings in the WON Field in Egypt. In Abu Dhabi International Petroleum Exhibition and Conference (p. D031S090R003). SPE. https://doi.org/10.2118/192608-MS
Rahanjani, Y. E., & Nugraha, B. (2020). Real-Time Data Transmission and Visualization as a Powerful Technology to Reduce Non-Productive Time During Drilling Operations: Present Day Capabilities, Limitation, and Future Development. Scientific Contributions Oil and Gas, 43(3), 135-142. https://doi.org/10.29017/SCOG.43.3.515
Published
Issue
Section
License
Copyright (c) 2025 © Copyright by Authors. Published by LEMIGAS

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors are free to Share — copy and redistribute the material in any medium or format for any purpose, even commercially Adapt — remix, transform, and build upon the material for any purpose, even commercially.
The licensor cannot revoke these freedoms as long as you follow the license terms, under the following terms Attribution — You must give appropriate credit , provide a link to the license, and indicate if changes were made . You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
No additional restrictions — You may not apply legal terms or technological measures that legally restrict others from doing anything the license permits.









