Abstract

A marginal oil field (MOF) is a field with relatively small hydrocarbon reserves located at significant depths. This presents major technical and economic challenges for its development. In the Central Sumatra Basin, a MOF with fair development potential has been discovered. The development of this MOF has to be analyzed to determine its feasibility. Previous research has predominantly evaluated oil field feasibility using conventional metrics, such as net present value (NPV) and profitability index (PI). However, assessing feasibility with a Syariah economic approach is an underdeveloped area of study. This study aims to compare conventional and Syariah methods for assessing MOF feasibility. The study involved field observation, primary and secondary data collection, calculation of reserves and oil production, cost estimation, oil price forecasting, and cash flow preparation based on a production sharing contract gross split contract scheme. The economic evaluation was conducted using conventional economic indicators (NPV, internal rate of return (IRR), payout time (POT), and PI) and Syariah indicators, namely, the gold value method (GVM) and gold index (GI). It is found that the development of the MOF is economically feasible. The NPV reached USD 172.27 million, with an IRR of 16.50%, a POT of 3.86 years, and a PI of 1.04. Moreover, the GVM was 10,687.03 grams of gold, and the GI stood at 1.20. This study demonstrates that the results of the Syariah method are consistent with those of the conventional methods, affirming its viability as an alternative evaluation approach for MOF development.

References

Abdulkadir, M. K. (2024). Advance Digital Technology Solutions for Enhancing the Productivity of Marginal Oil and gas Fields in Nigeria. Petroleum Technology Development Journal, 14(2). https://doi.org/10.21275/sr23624065052

Afaz, T., & Gusman, M. (2021). Analisis Kelayakan Investasi Menggunakan Metode Discounted Cash Flow pada Tambang Aspal PT. Wijaya Karya Bitumen di Desa Nambo Kecamatan Lasalimu, Kabupaten Buton, Sulawesi Tenggara. Jurnal Bina Tambang, 6(6), 84–95.

Agustin, H. (2016). Comparative Feasibility Study Analysis of Islamic and Conventional (Case Study Quail Farm in Pekanbaru). Jurnal Ekonomi KIAT, 27(2), 23–37.

Agustin, H. (2017). Analisis Keuangan Kelayakan Bisnis Syariah Hamdi’s Model (Studi Kasus Usaha Swalayan Syariah di Pekanbaru). Jurnal Manajemen Bisnis Indonesia, 4(3), 295–305.

Agustin, H., Afwa, A., & Jamil, P. C. (2022). Analisis Studi Kelayakan Bisnis Menggunakan Konsep Hamdi’s Method. Prosiding Forum Manajemen Indonesia Ke-14, 1–12.

Agustin, H., Almuttaqin, M. A., Yusnita, R. R., & Safitri, N. (2023). Analyzing Business Feasibility: A Comprehensive Study Using Hamdi’s Method. Journal of System and Management Sciences, 13(4), 521–534. https://doi.org/10.33168/JSMS.2023.0431

Agustin, H., Azmi, N., Armis, & Asril. (2021). Analisis Pengembangan Usaha Nenas Sakinah Berdasarkan Aspek Keuangan Konvensional dan Syariah (Hamdi’s Method). Jurnal Tabarru’ : Islamic Banking and Finance, 4(1), 219–230.

Agustin, H., & Azwirman, A. (2019). The Analysis Feasibility Study on the Financial Aspects of Islamic Perspective. 6th Annual International Conference on Management Research (AICMaR 2019), 70–73.

Al-Attas, M. S. S., & Yasutra, A. (2021). Feasibility Study and Technical Optimization by Implementing Steam Flooding for the Field Development Plan of A Heavy-Oil Field in Yemen. Scientific Contributions Oil and Gas, 44(3), 183–198.

https://doi.org/10.29017/SCOG.44.3.711

Ariyon, M. (2013). Analisis Ekonomi Pemilihan Electric Submersible Pump Pada Beberapa Vendor Economic. Journal of Earth Energy Engineering, 2(2), 9–19.

Ariyon, M., Santika, B., & Fitrianti. (2022). Economic Feasibility Analysis of Fishing Job Operation in Well YS13. Journal of Geoscience, Engineering, Environment, and Technology, 7(4), 189–195. https://doi.org/10.25299/jgeet.2022.7.4.10190

Butar, M. H. P. B., Juventa, & Marlinda, L. (2023). Identifikasi Prospek Reservoir Hidrokarbon Menggunakan Inversi Impedansi Akustik Pada Blok Kampar. Lembaran Publikasi Minyak Dan Gas Bumi, 57(1), 43–59. https://doi.org/10.29017/lpmgb.57.1.1324

Casdira, & Fikri, M. F. (2010). Perbandingan Analisis Keekonomian PSC dan Gross Split Menggunakan Metode Deterministik. The 39th IAGI Annual Convention and Exhibition, 1–7.

Danastri, T. I., Manouchehr, A., & Hajeera, S. (2024). Economic Work Evaluation Of New Zone Behind Pipe Based On Psc Cost Recovery And Gross Split Contract In YL Field. Journal of Geoscience, Engineering, Environment, and Technology, 9(2), 163–168. https://doi.org/10.25299/jgeet.2024.9.2.15480

Daniel, H. (2017). Indonesian Milestone in Production-Sharing Contract in Perspective of Government Take, Contractor Take, Cost Recovery and Production Target. SPE-187008-MS, 1–18.

Dwirini, Dewi, K., Relasari, Rostartina, E., & Abdulrohman. (2020). Strategi-Strategi dalam Mengontrol Cash Flow di Era Pandemi Bagi Pelaku UMKM dan Masyarakat Desa Kerinjing. Jurnal Ilmiah Manajemen, 9(3), 24–35.

Fajri, M. (2020). Analisis Hukum Skema Kontrak Gross Split Terhadap Peningkatan Investasi Hulu Minyak dan Gas Bumi. Jurnal Hukum & Pembangunan, 50(1), 54–70. https://doi.org/10.21143/jhp.vol50.no1.2482

Herawati, I., Rita, N., Novrianti, N., & Taufand, R. M. (2017). Analyzing The Statistics Function For Determination Of Oil Flow Rate Equation in New Productive Zone. Journal of Geoscience, Engineering, Environment, and Technology, 2(1), 69–75. https://doi.org/10.24273/jgeet.2017.2.1.34

Intaniasari, K. (2020). Gross Split Contract Framework Regulation on the Caring for People. Jurnal Bestuur, 8(2), 96–107. https://doi.org/10.20961/bestuur.43141

Irwin, R. W. (2015). Penentuan Isi Awal Minyak dan Peramalan Produksinya dengan Metode Decline Curve Analysis di Lapangan “R.” Seminar Nasional Cendekiawan, 411–421.

Jumiati, W., & Sismartono, D. (2018). Tantangan Keekonomian Kontrak Bagi Hasil Gross Split dan Cost Recovery (Studi Kasus Lapangan Gas Offshore di Sumatera Bagian Utara). Lembaran Publikasi Minyak Dan Gas Bumi, 52(2), 105–112. https://doi.org/10.29017/LPMGB.52.2.350

Mardiana, D. A., Rakhmanto, P. A., Riswati, S. S., Sofilda, E., Aribawa, S., & Martines, G. (2024). Petroleum Fiscal Regimes Attractiveness in Indonesia, Malaysia and Thailand: Application on Offshore Project Development. Scientific Contributions Oil and Gas, 47(3), 265–276. https://doi.org/10.29017/SCOG.47.3.1633

Nonci, R., Fauzi, A., Thamrin, F. D., & Pertanian Bogor, I. (2020). Analisa Deskripsi Minyak dan Gas (Studi Kasus Lapangan “X”). Equilibrium: Jurnal Penelitian Pendidikan Dan Ekonomi, 17(2), 44–50. https://doi.org/10.25134/equi.v17i02

Oliviaputie, T., & Sa’diyah, K. (2022). Analisa Ekonomi Prarancangan Pabrik Kimia Pembuatan Pupuk Organik Cair dari Sekam Padi Kapasitas 8.000 Ton/Tahun. Jurnal Teknologi Separasi, 8(3), 646–653. http://distilat.polinema.ac.id

Pan, J., Meng, Y., Sun, N., Liu, C., Yang, S., Xu, J., Wu, W., Li, R., & Chen, Z. (2022). Review of Marginal Oil Resources in Highly Depleted Reservoirs. Processes, 10(2), 1–11. https://doi.org/10.3390/pr10020245

Pramadika, H., & Satiyawira, D. B. (2018). Pengaruh Harga Gas dan Komponen Variabel Terhadap Keuntungan Kontraktor pada Gross Split. Jurnal Petro, VII(3), 113–117. http://trijurnal.lemlit.trisakti.ac.id/index.php/petro

Rahman, F. A., & Oktaviani, R. N. (2022). Analisis Studi Kelayakan Bisnis Syariah pada Industri Kecil dan Menengah dalam Mendapatkan Pembiayaan dari Perbankan Syariah. Jurnal Tabarru’ : Islamic Banking and Finance, 5(1), 108–121.

Ridwan, A. F., Romli, Z., & Soeroto, W. M. (2022). Analisa Kelayakan Investasi Proyek Penggantian Secondary Crusher pada PT Berau Coal Site Binungan. Sebatik, 26(1), 1–8. https://doi.org/10.46984/sebatik.v26i1.1832

Rulandari, N., Rusli, B., Mirna, R., Nurmantu, S., & Setiawan, M. I. (2018). Valuation of Production Sharing Contract Cost Recovery Vs Gross Split in Earth Oil and Gas Cooperation Contracts in Indonesia and the Aspect of Public Service. Journal of Physics: Conference Series, 1114(1), 1–9. https://doi.org/10.1088/1742-6596/1114/1/012132

Saphiro, Z. (2017). Peramalan Kinerja Produksi Minyak pada Lapangan “Z” dengan Menggunakan Decline Curve Analysis. Jurnal Petro 2017, VI(4), 143–147.

Shereih, K. (2016). Economics Modeling for Petroleum Exploration and Production Projects Considering Risk and Imprecise Data. https://doi.org/10.14279/depositonce-4983

Sudarti, Elly, F. H., & Rengkung, L. R. (2021). Analisis Kelayakan dan Sensitivitas Usaha Pembibitan Krisan Teknik Stek Pucuk (Studi Kasus Penangkar Bibit Krisan di Kakaskasen Dua). Jurnal Agrisosioekonomi, 17(2), 655–666.

Sugiyartomo, F. H. (2019). The Legality of Oil & Gas Production Sharing Contract Gross Split Scheme. Indonesian Journal of Energy, 2(1), 29–37. http://iesr.or.id/wp-content/uploads/Heru-Wibowo_DJA-Kemenkeu.pdf

Usman, Hazman, Pribadi, E., Lucia, A., & Widarsono, B. (2019). Kajian Regulasi Pengusahaan Oil Sands Kedalaman Dangkal dengan Metode Oil Mining. Lembaran Publikasi Minyak Dan Gas Bumi, 53(1), 1–14. https://doi.org/10.29017/lpmgb.53.1.265

Published

25-08-2025

Issue

Section

Articles